- Electric cars
- GWM
- ORA
Sedan · 5 seats · AWD
Available to orderGWM ORA
Everything you need to plan life with a ORA: 6 variants compared, charging times at real charger powers, current prices, and how many stations it can actually use.
- Estimated range*
- 430 km
- Useable battery
- 83.5 kWh
- 10–80% @ 150 kW
- ~44 min
- Efficiency
- 194 Wh/km
Pick your version
ORA variants compared
| Variant | Battery | Range* | Drive | 0–100 | Germany | Netherlands | UK | Status |
|---|---|---|---|---|---|---|---|---|
| ORA 07 GT Reference | 83.5 kWh | 430 km | AWD | 4.5 s | €53,490 | — | — | Available |
| ORA 07 Pure | 64.3 kWh | 350 km | FWD | 8.2 s | €41,990 | — | — | Available |
| ORA 07 Pro | 64.3 kWh | 350 km | FWD | 8.2 s | €44,490 | — | — | Available |
| ORA 03 63 kWh | 59.3 kWh | 340 km | FWD | 8.2 s | €32,490 | — | — | Available |
| ORA 03 GT | 59.3 kWh | 325 km | FWD | 8.2 s | €37,490 | — | — | Available |
| ORA 03 48 kWh | 45.4 kWh | 260 km | FWD | 8.3 s | €26,990 | — | — | Available |
*Range figures are PlugSphere estimates of real-world driving range under mixed conditions — expect less in winter or at sustained motorway speeds. Prices include VAT for each market; * marks announced-but-unconfirmed prices.
At the charger
How fast does the GWM ORA charge?
Estimated 10–80% session times for the ORA 07 GT (83.5 kWh useable), computed by PlugSphere from the battery size, the 11 kW onboard AC charger and a typical DC charging power of 80 kW.
| Charger | Effective power | 10–80% time | Range added per 10 min |
|---|---|---|---|
| 7.4 kW AC | ~6.7 kW | ~8 h 47 min | ~6 km |
| 11 kW AC | ~9.9 kW | ~5 h 54 min | ~9 km |
| 22 kW AC | ~9.9 kW | ~5 h 54 min | ~9 km |
| 50 kW DC | ~50 kW | ~70 min | ~43 km |
| 150 kW DC | ~80 kW | ~44 min | ~69 km |
| 350 kW DC | ~80 kW | ~44 min | ~69 km |
Method: 10–80% covers 70% of the useable battery; AC assumes ~90% charging efficiency; DC assumes the session averages the car's typical charging power up to the charger's limit. Real sessions vary with temperature and battery state.
Out in the real world
Where can a GWM ORA charge?
144,123
charging stations on the PlugSphere map have a connector this car can use (Type 2 CCS).
38,056
of them offer DC fast charging at 50 kW or more for quicker road-trip stops.
Counts from PlugSphere's worldwide station database (Open Charge Map data), refreshed with each import.
The details
GWM ORA specifications
GWM ORA — common questions
Answers computed from this model's data in the PlugSphere database.
Does the GWM ORA have a heat pump?
Yes — a heat pump is available, which helps protect driving range in cold weather.
Can the GWM ORA tow?
No — this model is not approved for a towbar.
Can it power external devices (V2L)?
No — vehicle-to-load is not supported on this model.
What battery does the GWM ORA use?
The reference variant uses a NCM pack with 83.5 kWh of useable capacity.
Which public chargers can the GWM ORA use?
The GWM ORA charges via Type 2 CCS. On the PlugSphere map that matches 144,123 stations worldwide, of which 38,056 offer 50 kW+ DC fast charging.
How much does it cost to fully charge a GWM ORA?
With its 83.5 kWh useable battery, a full charge costs about €25.05 at a €0.30/kWh home tariff or roughly €50.10 at a €0.60/kWh public DC charger — before any session or idle fees. Put your own local price into the PlugSphere charging-cost calculator for an exact figure per country and per session.
How long will I be waiting at a charger with a GWM ORA?
Plan around 44 minutes for the usual 10–80% stop at a 150 kW charger — the GWM ORA sustains roughly 80 kW in a DC session. On AC, a full overnight charge at 11 kW takes about 8 hours. The charging-time calculator covers any charger power and state of charge.
How long does the GWM ORA battery last?
Expect the pack to outlast its industry-standard warranty of 8 years or 160,000 km to at least 70% capacity: fleet telemetry shows EV batteries losing only around 1.8–2% a year on average. The ORA uses NCM chemistry — keep daily charging near 80% to age it gently.
How much does a GWM ORA battery replacement cost?
Out of warranty, a 83.5 kWh pack costs roughly €8,400–€15,000 at 2026 pack-level prices of €100–180 per kWh, plus labour. Inside the 8-year battery warranty a failing pack is replaced free, and single-module repairs are often a fraction of the full price.
Should I charge the GWM ORA to 100% every night?
Daily 80% is the kinder habit for this model (NCM chemistry) — reserve 100% charges for long-trip days. Only LFP-battery EVs are designed for routine full charging.
Where should I stop on a long GWM ORA trip — and what is plan B?
The PlugSphere route planner spaces stops for the GWM ORA's real range (segments of roughly 344 km with a 90% start and 10% reserve) and picks stations along the actual road route — each suggested stop comes with two nearby backup chargers in case the first is busy or offline.
Shopping around?
Similar electric cars
Data compiled and computed by PlugSphere from manufacturer specifications and public sources; charging and range figures are estimates, not laboratory results. Spot an error? Tell us.